Start with the right design inputs.

For dry assembly and garment areas, consider workstation layouts, daylight control, worker facilities and goods movement. Wet processing introduces different drainage, water and treatment interfaces. Machine vibration, clear height and service distribution should be addressed through the engineering design. Leave access for servicing and cleaning the plant without interrupting unrelated production areas.

Coordinate the construction package.

Agree whether the scope covers the production building alone or also stores, utility structures and treatment facilities. Check long-lead roofing and structural components against equipment-installation dates. Floor and service installation should be released in a sequence that allows the line to be installed safely. The operator retains responsibility for production and environmental permissions.

Our in-house teams bring planning, civil construction, services coordination and finishing into one project conversation. We agree responsibilities for the building work and each specialist package, with inspection stages and handover requirements recorded in the programme.

What to send for a proposal

  • Process type and equipment layout
  • Working environment and worker-facility brief
  • Wet-process and utility interfaces where applicable
  • Building, treatment and external-work boundaries

Common questions

Can I discuss this project in India or Dubai?

Yes. Share the exact location, current design stage and the construction package you need. Our team will discuss the site, programme and delivery arrangements with you. The head office is at Amrita Towers, Kochi, Kerala.

What will a construction proposal include?

We review process type and equipment layout, the available drawings and the intended handover condition. The proposal sets out the work, specifications, quantities, interfaces and exclusions so it can be assessed against the same project brief.

How are cost and completion dates agreed?

The estimate and programme follow the site information, design, scope and procurement requirements. We identify decision dates and specialist interfaces before agreeing milestones. A single area rate cannot describe every site, system or finish specification.

Related project types

Bring us your project brief.

450+ completed projects and 20 million+ sq ft completed. Tell us what you want to build and where.

Discuss your project