Start with the right design inputs.

Identify milk or ingredient reception, process rooms, packaging lines and returnable-container movements. Falls and drain positions have to suit cleaning without creating crossings that complicate hygiene control. The layout should also provide access to service equipment outside production rooms. Refrigeration, hot water and other utilities need space for maintenance as well as initial installation.

Coordinate the construction package.

Freeze the equipment setting-out information before floor and trench construction. Plan inspections for waterproofing, drain interfaces and protective finishes. The programme must allow the process supplier to install and test equipment without damaging accepted building work. Product trials and operational validation remain with the operator and its specialist team.

Our in-house teams bring planning, civil construction, services coordination and finishing into one project conversation. We agree responsibilities for the building work and each specialist package, with inspection stages and handover requirements recorded in the programme.

What to send for a proposal

  • Product range and process-flow diagram
  • Wet-area and cleaning requirements
  • Cold-room and utility interfaces
  • Installation and product-trial responsibilities

Common questions

Can I discuss this project in India or Dubai?

Yes. Share the exact location, current design stage and the construction package you need. Our team will discuss the site, programme and delivery arrangements with you. The head office is at Amrita Towers, Kochi, Kerala.

What will a construction proposal include?

We review product range and process-flow diagram, the available drawings and the intended handover condition. The proposal sets out the work, specifications, quantities, interfaces and exclusions so it can be assessed against the same project brief.

How are cost and completion dates agreed?

The estimate and programme follow the site information, design, scope and procurement requirements. We identify decision dates and specialist interfaces before agreeing milestones. A single area rate cannot describe every site, system or finish specification.