Start with the right design inputs.

Start with the dwelling mix and the floor-by-floor area schedule. Coordinate vertical shafts early so toilets, kitchens and services do not force changes through the structure. Consider the route for replacing pumps and other shared equipment after occupation. A neat apartment plan still needs workable basement access, visitor movement and common-area drainage.

Coordinate the construction package.

For repeated floors, a representative sample flat or finish panel helps settle quality expectations before repetition. Divide the programme into structure, service installation, closing works and testing. The contract should explain whether the appointment covers common facilities, interiors, utility connections and the documentation needed by the owner or association.

Our in-house teams bring planning, civil construction, services coordination and finishing into one project conversation. We agree responsibilities for the building work and each specialist package, with inspection stages and handover requirements recorded in the programme.

What to send for a proposal

  • Unit mix and floor-area schedule
  • Approved plans and common facilities
  • Lift, fire, water and power interfaces
  • Sample unit and phased occupation requirements

Common questions

Can I discuss this project in India or Dubai?

Yes. Share the exact location, current design stage and the construction package you need. Our team will discuss the site, programme and delivery arrangements with you. The head office is at Amrita Towers, Kochi, Kerala.

What will a construction proposal include?

We review unit mix and floor-area schedule, the available drawings and the intended handover condition. The proposal sets out the work, specifications, quantities, interfaces and exclusions so it can be assessed against the same project brief.

How are cost and completion dates agreed?

The estimate and programme follow the site information, design, scope and procurement requirements. We identify decision dates and specialist interfaces before agreeing milestones. A single area rate cannot describe every site, system or finish specification.

Related project types

Bring us your project brief.

450+ completed projects and 20 million+ sq ft completed. Tell us what you want to build and where.

Discuss your project