Start with the right design inputs.

An existing-condition survey should record structure, services, access and areas that remain occupied. Structural changes need assessment by the responsible engineer before demolition is planned. For facade, roof or wet-area work, trace the cause of defects rather than replacing visible finishes alone. Confirm how materials and debris can move through the property.

Coordinate the construction package.

Agree investigation openings, temporary protection and the sequence for service isolation. Allow for discoveries to be recorded and priced through an agreed change process. If the building remains operational, create phase boundaries and a reinstatement plan. Do not promise a fixed completion or cost before the extent of concealed work has been assessed.

Our in-house teams bring planning, civil construction, services coordination and finishing into one project conversation. We agree responsibilities for the building work and each specialist package, with inspection stages and handover requirements recorded in the programme.

What to send for a proposal

  • Existing drawings and condition survey
  • Proposed changes and engineering assessment
  • Occupied-area and service-isolation plan
  • Investigation allowance and change procedure

Common questions

Can I discuss this project in India or Dubai?

Yes. Share the exact location, current design stage and the construction package you need. Our team will discuss the site, programme and delivery arrangements with you. The head office is at Amrita Towers, Kochi, Kerala.

What will a construction proposal include?

We review existing drawings and condition survey, the available drawings and the intended handover condition. The proposal sets out the work, specifications, quantities, interfaces and exclusions so it can be assessed against the same project brief.

How are cost and completion dates agreed?

The estimate and programme follow the site information, design, scope and procurement requirements. We identify decision dates and specialist interfaces before agreeing milestones. A single area rate cannot describe every site, system or finish specification.