Start with the right design inputs.
Price the package against the latest drawing register and a clear method of measurement. Record who supplies concrete, reinforcement, formwork, scaffolding and lifting access where relevant. Clarify survey control, setting out, inspection requests and temporary-work responsibilities. A low unit rate is difficult to compare when resource and interface assumptions are left unstated.
Coordinate the construction package.
Build the programme around released drawings, front availability and inspection turnaround. Document daily progress and changes so valuations can be traced to accepted quantities. Agree the route for instructions, variation approval and closure of defects. In-house teams help coordination, but every package still needs an explicit scope and realistic access conditions.
Our in-house teams bring planning, civil construction, services coordination and finishing into one project conversation. We agree responsibilities for the building work and each specialist package, with inspection stages and handover requirements recorded in the programme.
What to send for a proposal
- Drawing register and measured quantities
- Material, plant and temporary-work split
- Work-front release and inspection process
- Valuation, variation and completion terms
Common questions
Can I discuss this project in India or Dubai?
Yes. Share the exact location, current design stage and the construction package you need. Our team will discuss the site, programme and delivery arrangements with you. The head office is at Amrita Towers, Kochi, Kerala.
What will a construction proposal include?
We review drawing register and measured quantities, the available drawings and the intended handover condition. The proposal sets out the work, specifications, quantities, interfaces and exclusions so it can be assessed against the same project brief.
How are cost and completion dates agreed?
The estimate and programme follow the site information, design, scope and procurement requirements. We identify decision dates and specialist interfaces before agreeing milestones. A single area rate cannot describe every site, system or finish specification.