Start with the right design inputs.
Confirm whether the proposal involves an on-site generation unit, storage installation or a different process arrangement. Each has its own layout, loads, access and segregation requirements. Resolve foundations, holding-down components and equipment offloading routes with the vendor. Avoid using a photograph or a standard factory layout as the basis for a safety-critical civil estimate.
Coordinate the construction package.
Plan inspection releases for foundations, anchors and buried services before equipment arrives. Agree who handles statutory permissions, specialist installation, testing and operating procedures. Civil handover should be recorded separately from plant commissioning. The agreed package records the civil work, its inspection stages and the condition required for the specialist installation.
Our in-house teams bring planning, civil construction, services coordination and finishing into one project conversation. We agree responsibilities for the building work and each specialist package, with inspection stages and handover requirements recorded in the programme.
What to send for a proposal
- Vendor layout and installation type
- Certified foundation loads and anchor positions
- Site safety and access requirements
- Civil handover and plant-commissioning boundaries
Common questions
Can I discuss this project in India or Dubai?
Yes. Share the exact location, current design stage and the construction package you need. Our team will discuss the site, programme and delivery arrangements with you. The head office is at Amrita Towers, Kochi, Kerala.
What will a construction proposal include?
We review vendor layout and installation type, the available drawings and the intended handover condition. The proposal sets out the work, specifications, quantities, interfaces and exclusions so it can be assessed against the same project brief.
How are cost and completion dates agreed?
The estimate and programme follow the site information, design, scope and procurement requirements. We identify decision dates and specialist interfaces before agreeing milestones. A single area rate cannot describe every site, system or finish specification.
Related project types
Bring us your project brief.
450+ completed projects and 20 million+ sq ft completed. Tell us what you want to build and where.
Discuss your project