Start with the right design inputs.
Establish equipment loads, vibration inputs, containment needs and material exposure. Drainage routes should follow the approved segregation and treatment strategy. A general building specification is not a substitute for process-specific decisions about containment or hazardous areas. Preserve access for inspection and maintenance, including the replacement of large equipment.
Coordinate the construction package.
Agree the concrete, protective finish and testing specifications before quantities are priced. Set hold points for embedded components and below-ground work. On an operating plant, the owner must define isolation and permit-to-work arrangements. The appointment records the construction package, its specialist design inputs and the inspections required before each area is handed over.
Our in-house teams bring planning, civil construction, services coordination and finishing into one project conversation. We agree responsibilities for the building work and each specialist package, with inspection stages and handover requirements recorded in the programme.
What to send for a proposal
- Process drawings and hazard-study outputs
- Equipment foundations and containment details
- Materials, coating and testing specifications
- Live-site controls and package responsibility matrix
Common questions
Can I discuss this project in India or Dubai?
Yes. Share the exact location, current design stage and the construction package you need. Our team will discuss the site, programme and delivery arrangements with you. The head office is at Amrita Towers, Kochi, Kerala.
What will a construction proposal include?
We review process drawings and hazard-study outputs, the available drawings and the intended handover condition. The proposal sets out the work, specifications, quantities, interfaces and exclusions so it can be assessed against the same project brief.
How are cost and completion dates agreed?
The estimate and programme follow the site information, design, scope and procurement requirements. We identify decision dates and specialist interfaces before agreeing milestones. A single area rate cannot describe every site, system or finish specification.