Start with the right design inputs.

Clarify occupancy, floor loading, floor-to-floor height, parking and the intended fit-out density. The structural grid and core position influence how a floor can be divided later. Coordinate facade access and roof plant positions before the external design is fixed; these choices affect both installation and the owner’s ongoing maintenance arrangements.

Coordinate the construction package.

Compare quotations against a common specification and floor-area basis. Shell-and-core delivery is different from a fully fitted office. Agree the finish samples, testing responsibilities and records to be handed over. For multi-tenant properties, plan independent metering and service isolation so one occupier’s changes do not unnecessarily interrupt the others.

Our in-house teams bring planning, civil construction, services coordination and finishing into one project conversation. We agree responsibilities for the building work and each specialist package, with inspection stages and handover requirements recorded in the programme.

What to send for a proposal

  • Use, floor areas and occupancy brief
  • Shell-and-core or fitted handover scope
  • Structural grid, facade and service layouts
  • Tenant access, metering and maintenance needs

Common questions

Can I discuss this project in India or Dubai?

Yes. Share the exact location, current design stage and the construction package you need. Our team will discuss the site, programme and delivery arrangements with you. The head office is at Amrita Towers, Kochi, Kerala.

What will a construction proposal include?

We review use, floor areas and occupancy brief, the available drawings and the intended handover condition. The proposal sets out the work, specifications, quantities, interfaces and exclusions so it can be assessed against the same project brief.

How are cost and completion dates agreed?

The estimate and programme follow the site information, design, scope and procurement requirements. We identify decision dates and specialist interfaces before agreeing milestones. A single area rate cannot describe every site, system or finish specification.

Related project types

Bring us your project brief.

450+ completed projects and 20 million+ sq ft completed. Tell us what you want to build and where.

Discuss your project