Our Services

residential buildings

A residential building is defined as the building which provides more than half of its floor area for dwelling purposes. In other words, residential building provides sleeping accommodation with or without cooking or dining or both facilities.

landscaping

Building, installation, and removal of certain features are all characteristics of landscaping, but these are characteristics of construction as well. Landscaping involves doing any of the following actions to a piece of land:

  • Destroying existing features

  • Excavating

surveying

Construction surveying or building surveying is to stake out reference points and markers that will guide the construction of new structures such as roads or buildings. These markers are usually staked out according to a suitable coordinate system selected for the project.

commercial buildings

Commercial buildings are buildings where commercial activities take place. Commercial buildings include office buildings, retail space, warehouses and more.

soil testing

Soil testing is primarily done to test the bearing capacity. The chemical and physical composition of the soil is checked during this process. The soil must have the ability to withstand the weight of the building. Quality of soil not only determines the bearing capacity but it ensures to determine the structure stabilization.

interior design

Interior design is the art and science of enhancing the interior of a building to achieve a healthier and more aesthetically pleasing environment for the people using the space.